MECIP provides complete engineering design services and information management solutions to the oil & gas and petrochemical industries with expertise in both downstream and upstream industries. We offer a broad spectrum of technical expertise to solve wide variety of industrial challenges.
MECIP has enjoyed a steady growth since inception, with staff numbering over 100, comprising experienced engineers,ICT specialists,designers,draft persons and support personnel.
Our main services are :
- Process Feasibility Studies
- Front End Engineering Design (FEED)
- Basic & Detailed Engineering Design
- EPCM Service
- Plant Reliability
- Project Management
- Energy Management & Plant Information Enhancement System
- Information & Supply Chain Management Solutions
Other services include :
- Plant Technical Integrity Assessment Studies
- Project Management Services
- Project Cost Estimates
- HAZOP Studies
- Inspection Services
- Thermal Scanning Service
We are focused on providing high quality engineering and cost-effective business solutions. Our mission is to fully embrace our client’s business goals. By melding the talents of our team into a seamless and cohesive unit,we will deliver innovative solutions, in the process and industrial market that achieve our client’s goals.
MECIP is the Term Engineering Consultant (with contract typically running for 3 years) for the following companies:
- Petronas Penapisan (T) Sdn Bhd
- Ethylene Malaysia Sdn Bhd
- Polyethylene Malaysia Sdn Bhd
- Vinyl Cloride (M) Sdn Bhd -
- Petronas Fertilizer (Kedah) Sdn Bhd
- Petronas Group Capability Management
- Sarawak Shell Bhd
MECIP‘s International Associates are:
- PEGASUS TSI Inc (formerly known as MUSTANG Tampa Inc) – Florida
- Transfield Services – Australia
- Marshall Institute – USA
- ACTSYS Process Management – Singapore
- SES Europe – UK
MECIP‘s Local Associates are:
- Synergy Oil & Gas Engineering Sdn Bhd
- IFP Sdn Bhd
- Winmore Engineering Sdn Bhd
- Integrio Engineering Sdn Bhd
MECIP is a member of MOGSC and MOGEC.
____________________________________________________________________________
MECIP’s Key Personnel:
Ir.Ahmad Nazari Ashari – Managing Director/Professional Engineer (Electrical)
Professional Experience and Skills
- 27 years experience in PETRONAS in the oil and gas industry holding various positions in maintenance, design and engineering services (Turnaround Manager/Project Engineering Manager,PPTSB)
- Principal Interviewer for the Professional Interview of the Institution of the Engineers Malaysia (since 1997)
- Principal Examiner for the Professional Assessment of the Board of Engineers Malaysia (since 1994)
____________________________________________________________________________
Ir.Mohd Nor Abd Basar - Professional Engineer (Process)
Professional Experience and Skills
- Over 22 years experience in Oil & Gas and Petrochemicals
- 15 years experience in PETRONAS (Deputy Tech.Manager,Ethylene)
- Currently attach with PGTS as Master Coach for Process personnel in PETRONAS
___________________________________________________________________________
Sabri Ahmad – Principal Engineer (Process)
Professional Experience and Skills
- Over 20 years experience in Oil & Gas industry
- 15 years experience in PETRONAS (Senior Manager, Refining & Marketing Unit
- 2 years experience in ESSO (Process Engineer, ESSO Port Dickson)
- Currently attach with PFKSB as Process Safety Advisor
_____________________________________________________________________________
Efren C. Salom – Principal Engineer (Mechanical)
Professional Experience and Skills
- Over 20 years experience in engineering in various industries which includes LNG
and crude oil processing, offshore and onshore oil & gas, petrochemical,chemical, and other industrie - Performs Integrity analysis on piping and static equipment. i.e. stress analysis,
re‐rating - Currently attach with PGTS as Senior Mechanical‐Piping Engineer
____________________________________________________________________________
Ho Gan Sum – Principal Engineer (Project)
Professional Experience and Skills
- 33 years experience in field, plant operational experiences pertaining to electrical
engineering in Utilities & Oil & Gas industries - 15 years experience in Management/Senior Management level, opening up newkey directions in PETRONAS
- 4 years experience in plant project design & engineering consultancy
_____________________________________________________________________________
Ir. Ching Soon Jin – Professional Engineer (Instrument)
Professional Experience and Skills
- 5 years experience in semiconductor/electronic manufacturing (Product, Test and
Equipment Support Engineer ) - 7 years experience in Oil & Gas, Power and Petrochemical (Facility & Site Manager)
- 4 years of experience in chemical plant maintenance (Manufacturing Engineer
(E&I)
_____________________________________________________________________________
MECIP’s Project Award (2009) :
| NO
|
PROJECT TITLE
|
AWARD MONTH | CLIENT | MANHOURS | SCOPE OF SERVICE |
| 1 | Provision of Detailed Design Configuration Procurement, Testing, Installation, and Commissioning of Utilities & Cogen Optimisation | Jan-09 | PPMSB | 7800 | Energy Management Services (EMS) |
| 2 | Electrical Modification At Maintenance Office | Jan-09 | EPMSB | 512 | Engineering Design |
| 3 | Electrical Modification At Centralised Laboratory At PEMSB | Jan-09 | EPMSB | 146 | Detail Engineering Design |
| 4 | Detail Engineering Design of New Furnace Elevator | Jan-09 | EMSB | 340 | Detail Engineering Design |
| 5 | MTBE Intervention Program Phase 1 2008 | Feb-09 | PETRONAS | 240 | Training |
| 6 | Safety In Process Design | Feb-09 | INSTEP | 50 | Training |
| 7 | Engineering, Procurement, Construction Management & Commisioning for industrial Effluent Treatment System (IETS) Improvement Project at GPP-A | Feb-09 | VEOLIA | 600 | Detail Engineering Design |
| 8 | Safety In Process Design | March-09 | INSTEP | 50 | Training |
| 9 | Fire Water Modification Line | March-09 | PPTSB | 500 | Engineering Design |
| 10 | Provision of Engineering Services for Draw, Verify & As built sewer system modification work at PEMSB | March-09 | PEMSB | 600 | Detail Engineering Design |
| 11 | Hazardous Area Re-Classification at EMSB | April-09 | EMSB | 1200 | Engineering Design |
| 12 | Provision of Service for Design, Supply Delivery, Installation, Configuration, Testing, and Commissioning of Plant Information Enhancement (PIE) Systemt | April-09 | ABFSB | 6200 | Energy Management Services (EMS) |
| 13 | Fire Fighting Facilities for EPEMSB Schedule Waste | April-09 | PEMSB | 100 | Detail Engineering Design |
| 14 | Small Vessel’s Marpol Line for Water Plug | April-09 | PPTSB | 200 | Engineering Design |
| 15 | Technical Professional Career Progression | June-09 | PGTS | 160 | Consultation |
| 16 | Pipe Stress Analysis on BFW Line Rectification Project | June-09 | BPCM | 600 | Engineering Design |
| 17 | Debottlenecking Study at Existing 8” HP Steam Header to Supply HP Steam From KCS A HRSG and KCS B HRSG to GPP 2 & GPP 3 | June-09 | STEAMLINE | 700 | Detail Engineering Design |
| 18 | Installation of New Isolator at EMSB Central Lab | June-09 | EMSB | 50 | Detail Engineering Design |
| 19 | New Lamp Post Foundation | June-09 | EPEMSB | 50 | Detail Engineering Design |
| 20 | Reverse Engineering for 1 Unit of Existing Warehouse and Detail Engineering Design for 2 Units of New Warehouse at EMSB | July-09 | EPEMSB | 2100 | Engineering Design |
| 21 | Piping Modification for T3003 A/B for Oil Removal | July-09 | PPTSB | 200 | Engineering Design |
| 22 | MTBE Heavies Transfer to Crude Tank | July-09 | MTBE | 600 | Detail Engineering Design |
| 23 | Piping Replacement for Chemical Injection Pumps at KRI DAF WWTP Area | July-09 | PPTSB | 165 | Engineering Design |
| 24 | New Piping Utility Facility at KRI DAF WWTP Area | July-09 | PPTSB | 165 | Engineering Design |
| 25 | Safety In Process Design | August-09 | INSTEP | 50 | Training |
| 26 | Detail Engineering Design for LPG Storage at EPEMSB | August-09 | EPEMSB | 180 | Engineering Design |
| 27 | New Floating Suction Piping at KR2 Slop Tank T28301 | August-09 | PPTSB | 540 | Engineering Design |
| 28 | Provision of Engineering Consultancy Services for Additional Loading Station at KIC Oil Terminal, Westport | August-09 | KIC | 680 | Engineering Design |
| 29 | Condensate Piping Modification with Isolation Valves and Stress Analysis | Sept-09 | BPCM | 112 | Engineering Design |
| 30 | Provision of Comprehensive Engineering Audit Services for the Plant LPS System, Earthing System and Surge Transient Protection System in GPP A & KCS at PGB, Kerteh, Terengganu | Sept-09 | PGB | 900 | Engineering Audit |
| 31 | To perform Earthing System Study at GPP A | Sept-09 | PGB | 1100 | Study Work |
| 32 | COD Reduction Unit at KR2 Effluent Treatment Plant | Oct-09 | PPTSB | 3986 | Basic and Detail Engineering Design |
| 33 | Consultancy Fee Upgrade for Incoming Power TNB from 400 AMP to 1000 AMP | Oct-09 | KENCANA HL | 100 | Consultation |
| 34 | Sub Station Building Extension Work at PPTSB | Oct-09 | PPTSB | 510 | Detail Engineering Design |
| 35 | Detail Engineering Design for New Surau & Toilet (Electrical Work Only) | Oct-09 | EPEMSB | 244 | Detail Engineering Design |
| 36 | HAC Review Study | Nov-09 | MTBE | 2014 | Hazardous Area Classification |
| 37 | Development of Heat & Mass Balance, Energy & Air Balance for Sepang Integrated Biomass Power Plant | Dec-09 | OGP-Nova | 780 | Basic and Detail Engineering Design |
| 38 | To supply a Senior Process Engineer to PPTSB for Sour Water Stripper Simulation | Dec-09 | PPTSB | 40 | Process Engineering |
__________________________________________________________________________









on April 27, 2010 on 1:45 AM
has over 500 years of combined experience in O&G industry
on May 6, 2010 on 4:59 PM
you can add 1 more.. we are just awarded with Term Engineering Consultant for PCSB-PMO